Ghana Minute.
Monday, 14 September 2026
Ghana’s news, on the hour · Est. 2026
Monday, 14 September 2026
Accra—:—London—:—New York—:—Beijing—:—
Ghanaian press · Organization

Post Flood Mitigation Task Force

2026-09-132026-09-14

In coverage

Verbatim sentences from the source article.

  1. September 2026
  2. Daily Guide

    The directive was issued at Laboma following a demolition exercise by the Post Flood Mitigation Task Force as part of ongoing measures to restore flood-control infrastructure and protect critical water retention areas across Greater Accra.

    GARCC Ordered To Restore Kpeshie Lagoon After Demolition
  3. Joy Online

    Mr Dogbe issued the directive at Laboma following a demolition exercise conducted by the Post Flood Mitigation Task Force.

    Chief of Staff directs ecological restoration of reclaimed Kpeshie Lagoon
  4. Joy Online

    The finding has informed the ongoing intervention by the Post Flood Mitigation Task Force, which on Sunday demolished unauthorised structures built within the protected buffer zone of the lagoon at Laboma.

    Kpeshie Lagoon reclamation linked to first-ever flooding at Tse Addo – ISD

Today

  1. GARCC ordered to restore Kpeshie Lagoon ecosystem after demolitions

    Ghana's Deputy Chief of Staff has directed the Greater Accra Regional Coordinating Council to restore the Kpeshie Lagoon following removal of illegal structures, involving tree-planting and environmental safeguards to strengthen the wetland's capacity to retain floodwaters and prevent future encroachment.

    12 hours ago · Daily Guide

Yesterday

  1. Deputy Chief of Staff directs ecological restoration of Kpeshie Lagoon

    Deputy Chief of Staff Stan Xoese Dogbe has directed the Greater Accra Regional Coordinating Council to restore reclaimed sections of the Kpeshie Lagoon following removal of illegal structures, working with the Forestry Commission and EPA to plant trees and recover the ecosystem's flood-retention capacity.

    13 September 2026 · Joy Online

  2. Kpeshie Lagoon reclamation linked to Tse Addo flooding

    A risk assessment by the Greater Accra Regional Coordinating Council has linked reclamation and development of portions of Kpeshie Lagoon to first-time flooding in Tse Addo, finding that converting sections of the natural water retention basin into developed land reduced the lagoon's capacity to receive and retain excess water during heavy rainfall.

    13 September 2026 · Joy Online

Post Flood Mitigation Task Force — Ghanaian press coverage · Ghana Minute