ASEC calls for infrastructure reforms after Akosombo Substation fire
The Africa Sustainable Energy Centre has urged sweeping reforms in Ghana's electricity transmission infrastructure following an investigation into the Akosombo Substation fire, which was attributed to insulation failure caused by ageing infrastructure. ASEC called for strengthened maintenance practices, improved fire protection systems, and implementation of regular thermal imaging inspections across major substations.
Africa Sustainable Energy Centre calls for sweeping electricity infrastructure reforms following Akosombo fire, urging strengthened maintenance and thermal imaging across major substations nationwide.
12 June 2026 · Joy Online →