Department of Urban Roads — government agency responsible for urban road infrastructure projects and maintenance; overseeing Suame Interchange and drainage systems.
… The project is being undertaken by the Department of Urban Roads as part of efforts to address persistent flooding and drainage challenges at the busy Dansoman Junction. …
The Director-General of the Department of Urban Roads, James Oduro Amoo-Gottfied, says about 15 kilometres of inner roads within Suame and its surrounding areas have been completed to facilitate traffic diversion ahead of the construction of the Suame Interchange. …
The Director-General of the Department of Urban Roads, James Oduro Amoo-Gottfried, says the local roads component of the Suame Interchange Phase Two project will be fully completed and opened to traffic by October 2026. …
… nment, Chieftaincy and Religious Affairs, Ahmed Ibrahim, has rejected claims that Metropolitan, Municipal and District Chief Executives (MMDCEs) are responsible for the failure to desilt major storm drains, insisting that the responsibility lies with the Department of Urban Roads …
… Accra’s formal drainage infrastructure – the network of channels, culverts, and retention facilities maintained by the Accra Metropolitan Assembly and the Department of Urban Roads is chronically under-maintained, inadequately funded, and architecturally insufficient for the city …
… Roads and drainage GhIE further called for the formal integration of the Department of Urban Roads and the Ghana Highway Authority into the country’s flood response strategy. …
… He further urged the immediate deployment of security agencies and emergency responders to support affected communities and work alongside the Department of Urban Roads and the Ghana Highway Authority to restore access on flooded roads. …
… agencies and emergency services in a well-coordinated full-scale rescue operation, emergency response and… pic.twitter.com/ozHDXlTPWx— John Ntim Fordjour MP (@NtimFordjour) June 29, 2026 According to him, emergency institutions should work alongside the Department of Urban Roads …
… Ntim Fordjour stated. “Without delay, this is the time to activate all security agencies and emergency services in a well-coordinated full-scale rescue operation, emergency response and relief, while working with Department of Urban Roads and Ghana Highway Authority to ensure key …
… The delegation, led by Mr Maud Gbeckor-Kove, a Development Engineer with the Department of Urban Roads, paid a courtesy call on the Mayor of Kumasi, Mr Richard Ofori Agyemang Boadi, before inspecting the project site. …
The Ablekuma North Municipality is constructing a new underground drainage system at Dansoman Junction to address persistent flooding; the new drain will measure two metres high and five metres wide, significantly larger than the existing system, and is expected to improve stormwater flow and road conditions.
The Ablekuma North Municipality is constructing a new underground drainage system at Dansoman Junction to address persistent flooding; the new drain will measure two metres high and five metres wide, significantly larger than the existing system, and is expected to improve stormwater flow and road conditions.
The Director-General of the Department of Urban Roads says about 15 kilometres of inner roads within Suame and surrounding areas have been completed to facilitate traffic diversion ahead of construction of the Suame Interchange. He urged traders and others occupying areas within the road's right-of-way to voluntarily vacate to allow the project to proceed without delays.
The Department of Urban Roads Director-General says the local roads component of the Suame Interchange Phase Two project, covering approximately 15 kilometres and including three overpasses, will be fully completed and opened to traffic by October 2026 to provide alternative routes and reduce congestion.
The Local Government Minister has rejected claims that Metropolitan, Municipal and District Chief Executives are responsible for failure to desilt major storm drains, stating that the Department of Urban Roads holds the mandate and funds for such work. He noted that MMDAs receive only 10 per cent of the District Assemblies Common Fund for sanitation, making large-scale desilting impossible alongside other sanitation obligations.
The article argues that Accra's perennial flooding is fundamentally a governance crisis rooted in institutional failures and inadequate urban planning, rather than a natural disaster cycle. The city's vulnerability stems from low-lying topography, an aging drainage system designed for a much smaller population, and a river network that existing infrastructure cannot accommodate.
The Ghana Institution of Engineering has issued a position statement calling for sweeping reforms to address Ghana's recurring flooding, proposing a 19-point plan spanning immediate, medium and long-term actions. The statement, released after recent floods in Accra killed at least 12 people and displaced thousands, emphasizes that Ghana has sufficient technical knowledge to solve the problem but lacks implementation of established solutions.
Rev. John Ntim Fordjour, Ranking Member on Parliament's Defence and Interior Committee, has called on the government to declare Accra a disaster emergency zone for one week and mobilise all security agencies and emergency services in response to devastating floods that have inundated homes, businesses and roads across the capital.
Rev. John Ntim Fordjour, Ranking Member on Parliament's Defence and Interior Committee, has called for the government to declare Accra a one-week disaster emergency to enable security agencies and emergency responders to undertake coordinated rescue and relief operations. He also urged closer coordination between emergency services and road sector agencies to restore access to flood-affected communities.
Rev. John Ntim Fordjour, Ranking Member on Parliament's Defence and Interior Committee, has called on the government to declare Accra a disaster emergency zone for one week following widespread flooding from torrential rains. He urges immediate activation of security agencies and emergency services for coordinated rescue and relief operations to prevent further loss of life and property damage.
A consulting team from the Japan International Cooperation Agency has expressed satisfaction with preparatory works for the Santasi Roundabout to Asokwa Interchange dual carriageway project in Kumasi, commending the Kumasi Metropolitan Assembly for clearing the right of way. The Chief Consultant for JICA said contractor procurement would commence under the Japanese government once the inspection was completed and found satisfactory, with officials to conduct a final inspection and submit a report to facilitate the project's continuation.
Emeritus Professor Kwasi Kwafo Adarkwa has published "Navigating the Towns and Roads in Ghana," a district-by-district assessment of Ghana's road infrastructure and maintenance deficits across 16 regions. The book aims to provide a practical tool for policymakers, planners, engineers and local authorities, as more than 50% of Ghana's approximately 42,000 kilometres of roads are not in good condition.
The Minister of State in charge of Government Communications stated that over 90 percent of road projects under the 'Big Push' initiative were awarded through competitive tendering, refuting claims of abuse of single-sourcing procurement. Of 1,441 road contracts awarded by the Ministry of Roads and Highways, 1,301 were awarded through open or competitive tendering, with the remaining 140 awarded under the 'Big Push' initiative through various procurement methods.
The Minister of State for Government Communications has dismissed allegations of abuse in single-source procurement by the Ministry of Roads and Highways under the Big Push infrastructure programme, stating that a government investigation found more than 90 per cent of road contracts awarded in 2025 and 2026 were procured through open competitive tendering.
The government defended its 'Big Push' infrastructure programme, revealing through a 72-page investigative report commissioned by President Mahama that 47.14 per cent of contracts were awarded through sole-source procurement, contrary to allegations of widespread non-competitive contract awards.
The government says that 90.28 per cent of all road contracts awarded since 2025 were subjected to competitive procurement procedures, according to a 72-page report by the Senior Presidential Advisor on Governmental Affairs following allegations of sole-source procurement abuse by investigative outlets.
The government has dismissed allegations that the Ministry of Roads and Highways abuses sole-source procurement, revealing that only 4.58 per cent of road contracts awarded under the current administration were procured through sole-sourcing. A 72-page investigative report commissioned by President John Mahama found no evidence of widespread abuse of sole-source procurement in road contract awards.
A forensic audit commissioned by President Mahama into Ghana's organisation of the 2023 African Games has revealed over $40 million in avoidable costs and financial irregularities. The audit identified questionable claims, inflated rates and omitted works across projects, with the Borteyman Sports Complex alone accounting for an estimated $34.43 million in omissions and scope reductions from its original contract value of $145.09 million.